    Plastic inspection Wells,Plastic check well divided into community with check well and municipal use inspection Wells, should be according to the installation position of inspection well in engineering application, determine the corresponding inspection shaft specifications.A well,Inspection shaft should be set 1. Sewage flow slot, chute design specific requirements: slotted sewage check well flow should be 0.85 times with great diameter is flat, the flow of rainwater and confluence system inspection Wells slotted with 0.5 times fill pipe diameter is flat. Chute width at the top of the appropriate maintenance requirements.2. The rain check well want to slime room, various places have different practices, some area inside the village inspection Wells are not heavy mud chamber; In some areas...
  • Release time: 2013 - 12 - 11
    HDPE double-wall corrugated pipe is high density polyethylene as the main raw material, through the two method preparation and molding process. The first step has been produced by the extruder complete shrinkage, density, high strength type "T" slab; The third use of precast slab on the pipe forming machine winding and welding into pipe lining, at the same time, galvanized steel strip rolling into U steel belt into plate belt between the slot, and on the outside of the strip cladding PE become a new gangsu composite material of the outer wall of pipeline.HDPE double-wall corrugated pipe and compared with material solid wall pipe, can save nearly half of all raw materials, corrugated pipe is simple and reliable installation, so the HDPE double-wall corrugated pipe construction cos...
  • Release time: 2016 - 02 - 19
    1. The general provisions1.1. Before the pipe laying, the construction unit should prepare, construction organization design.1.2. Piping should be equipped in the undisturbed soil or through slot on post-processing backfill compacted foundation. When the pipe under the roadway, pipe roof covering should not be less than 0.7 m. When the pipe under the green way, pipe roof covering should not be less than 0.5 m.1.3. Construction, the maximum allowable covering on the top of the tube, should be stipulated in the design of pipe ring stiffness, on both sides of groove and check the condition of undisturbed soil, when found in accordance with the design requirements, may be required to change the design or take appropriate technical measures to ensure the bearing capacity. 1.4. When polyethylene...
MMC-ST series, make flying easier.
  • Release time: 2016 - 03 - 13
    The selection of instructions·General situation selection instructions1. Plastic drainage inspection well design, construction, inspection and maintenance in the new, expansion and renovation of urban and rural areas of municipal, residential area, public construction area of underground drainage pipeline project, the inspection well diameter is less than or equal to 1000 mm, the buried depth is less than or equal to 6 m.2. Can human operation check Ii (pipe wall) well diameter should be greater than or equal to 700mm.3. The water outlet of the road should be used in the inspection well seat of the mud chamber, the 450 is the start of the rain water outlet and the well diameter of the heavy mud well, and the well diameter is larger than the diameter of the drain pipe.4. Well bore diameter is less than 700mm is in the shape of straight wall wells, wells wellbore diameter greater than 700mm shape for closing wells, wells close to 700mm diameter.5. The well diameter of the well bore ...
  • Release time: 2016 - 04 - 19
  • Release time: 2016 - 04 - 26
    ·The pipeline1.slot construction craft, according to the construction site environment, the groove depth, the underground water level, soil condition, construction equipment and seasonal influence factors such as comprehensive selection.2.groove bottom width of dispute, in accordance with the groove depth, ground water, soil conditions and easy to operate, these provisions empty groove width table can be used for reference in the involved, the construction unit.3.underground water level is higher than the chamfered bottom elevation, when construction must take effective measures to underground water level dropped to the bottom of the channel under 0.3 to 0.5 meters.4.excavation groove, should strictly control the base elevation, shall not be disturbed base and overexcavation.Basement involved in elevation above 0.2 to 0.3 meters of undisturbed soil shall be preserved, before laying with artificial stripping to the design elevation. Piping specificationDN225DN300DN400DN500DN60...
  • Release time: 2016 - 04 - 26
    ·The pipeline1.slot construction craft, according to the construction site environment, the groove depth, the underground water level, soil condition, construction equipment and seasonal influence factors such as comprehensive selection.2.groove bottom width of dispute, in accordance with the groove depth, ground water, soil conditions and easy to operate, these provisions empty groove width table can be used for reference in the involved, the construction unit.3.underground water level is higher than the chamfered bottom elevation, when construction must take effective measures to underground water level dropped to the bottom of the channel under 0.3 to 0.5 meters.4.excavation groove, should strictly control the base elevation, shall not be disturbed base and overexcavation.Basement involved in elevation above 0.2 to 0.3 meters of undisturbed soil shall be preserved, before laying with artificial stripping to the design elevation. Piping specificationDN225DN300DN400DN500DN60...